Sunday, March 8, 2015

BIG Progress in the Kitchen


Over the past few weeks, we have made some serious progress on the kitchen.  Plumbing and gas are rerouted, as needed.  Electrical is updated to make more sense with the fuses, and to run the new switches. outlets, and light fixtures.  We have 3 recessed lights, and we'll be putting in 3 pendant lights-- 2 over our new island, and one over the dining table.

New sheetrock is installed, and our cabinets were delivered on Friday.  K got our pantry and one wall of cabinets installed on Friday.  And she and I got the other wall installed on Friday and today.



Our boy cat was having a blast climbing up the ladder and watching us work.  Such a good little assistant...





















I also cleaned up ALL of the cabinet and drawer pulls yesterday.  It took me over TWO hours to get all the paint peeled and scrubbed off those chrome pulls.  I soaked them in CLR and vinegar with a little water, and that definitely did the trick.  After about an hour, I really wanted to strangle those renters who painted over these.  So frustrating!  But at least they were still in the house-- I have to be thankful for that.

Before:


After:
Shiny chrome pulls

By the end of the day today, we had the cupboards all in, and it was amazing to see the new layout of the kitchen.  It's so different from how it was, and we think it's going to be really useful.  More workspaces and better spacing between the appliances.  And still lots of storage.

The pantry is on the left


We have the new GE Slate appliances.  K liked these because they're sleek like stainless, but darker and easier to keep clean.  I think they're gorgeous, and they perfectly match our free flooring.  We decided to use the same bamboo laminate that K had installed in her office.  There was plenty left over-- enough to use throughout the kitchen and mudroom. 

The cabinet doors and shelves will be ready tomorrow.  And after that we'll be able to decide where we want to keep all our kitchen items, and we can unpack some kitchen things that we've had in storage for a long time.

K says that the toughest stuff is done now.  What remains: the paint, tile backsplash, sink and faucets, the countertops (which she is making for us),  cabinet doors & pulls, light fixtures, touching up....       The end is finally starting to become visible!  I know for both of us, especially for her-- it felt like this project would never end.  Now we have some big, meaningful progress and it's really exciting.


No comments:

Post a Comment