BIG Progress in the Kitchen


Over the past few weeks, we have made some serious progress on the kitchen.  Plumbing and gas are rerouted, as needed.  Electrical is updated to make more sense with the fuses, and to run the new switches. outlets, and light fixtures.  We have 3 recessed lights, and we'll be putting in 3 pendant lights-- 2 over our new island, and one over the dining table.

New sheetrock is installed, and our cabinets were delivered on Friday.  K got our pantry and one wall of cabinets installed on Friday.  And she and I got the other wall installed on Friday and today.



Our boy cat was having a blast climbing up the ladder and watching us work.  Such a good little assistant...





















I also cleaned up ALL of the cabinet and drawer pulls yesterday.  It took me over TWO hours to get all the paint peeled and scrubbed off those chrome pulls.  I soaked them in CLR and vinegar with a little water, and that definitely did the trick.  After about an hour, I really wanted to strangle those renters who painted over these.  So frustrating!  But at least they were still in the house-- I have to be thankful for that.

Before:


After:
Shiny chrome pulls

By the end of the day today, we had the cupboards all in, and it was amazing to see the new layout of the kitchen.  It's so different from how it was, and we think it's going to be really useful.  More workspaces and better spacing between the appliances.  And still lots of storage.

The pantry is on the left


We have the new GE Slate appliances.  K liked these because they're sleek like stainless, but darker and easier to keep clean.  I think they're gorgeous, and they perfectly match our free flooring.  We decided to use the same bamboo laminate that K had installed in her office.  There was plenty left over-- enough to use throughout the kitchen and mudroom. 

The cabinet doors and shelves will be ready tomorrow.  And after that we'll be able to decide where we want to keep all our kitchen items, and we can unpack some kitchen things that we've had in storage for a long time.

K says that the toughest stuff is done now.  What remains: the paint, tile backsplash, sink and faucets, the countertops (which she is making for us),  cabinet doors & pulls, light fixtures, touching up....       The end is finally starting to become visible!  I know for both of us, especially for her-- it felt like this project would never end.  Now we have some big, meaningful progress and it's really exciting.


Friday, January 16, 2015

Room Craziness


It's been a rough week.  Whew.  Poor K is wiped out...  I can't keep up, either!  We've been working on the walls and ceilings in our rooms with hardwood floors, in order to get those walls before the floor guys come in to do the refinishing on Monday.

So, patching, mudding, sanding, painting our plaster & lathe walls.  Trying to repair years of damage and neglect.  It's totally working-- the walls look 100 times better!  It's just a LOT of work.

K used a sprayer to paint all our doors and windows, which were previously all a very industrial-looking tan (which we're SO sick of!)  We figured this would be a big improvement until we replace the windows, and visually, it is definitely much better!

Newspaper & painter's tape = cheap stained glass

Living room window, mid-taping
Post-spraying

She also sprayed all our vent covers, just so we didn't have to go out and buy all new ones right now, on top of all our other expenses.  Some of them were painted weird, just like our trim, and some were just old-looking.  Now, they may not all look perfect when you look closely, but they sure look better. 



Repairing progress in Baby's room

Above, the baby's room now has a smooth painted ceiling, painted windows and doors, and wall repair is mostly complete.  This room will have painted white trim around the windows and doors.  The other rooms will have stained wood trim.


Our room has a newly painted ceiling, painted walls, painted windows and closet doors.  The door to our room was too damaged, so we'll need to get a new one.  We decided not to mess with the texture on our ceiling.  I guess the look of it grew on us over these last couple years. But it was so much dingier than we had realized-- once K got painting it with the bright white paint, it was like, "WOW!"  It looks so clean and crisp, and the chandelier looks even nicer now.  Yay!

And ohhhhh, the living room.  I'm in love.  Seriously... we've never had a usable living room, in all the time we've owned the house.  For a few days, here and there, we've set up a sitting area when we needed to, but it was always on top of a big sisal rug, on top of the ram board from when we were working on the ceiling.  And there was always wrapped-up bookshelves in the corner, and storage stuff against the wall.  So, just never an actual "living room."
But it's already so pretty.
I'm so excited!

Living room, in progress
The ceiling and coves are smooth, painted, and gorgeous.  The windows are sprayed, which is a huge improvement.  K had to do some major repairs on the entryways to the room because the plaster had gotten nicked away over the years.  She built them back up, so now the corners are sharp and crisp once again.  And the walls, though still in progress, already look sooo much better.  :-)

Rough week, true, but it's so fantastic to see this progress and know we'll have actual finished rooms SOON!


Monday, January 12, 2015

Floor Prep and Room Progress


More progress on the rooms!  The ceiling in the nursery is now all scraped.  K was surprised at how nice it all came off-- much better than in the living room.  She thinks it will be really easy to mud and get cleaned up.



The hallway ceiling is also scraped.  This is the hallway that connects all the rooms on the first floor.  Just a small little space, but the ceiling looks a lot better already.




The trim around the living room windows has been pulled.  We'll just paint the inner wood parts, until we replace the windows.



Our floors are also accessible now, with the trim pulled in all the rooms.  We have some floor guys coming to refinish them in just a little over a week.  Can't wait!  K could do them herself, but she thinks it's just easier to have them do it, since it's such a messy process.  I'm excited to pick out the stain color.

These beautiful floors need some LOVE!

There are lots of little burns on the floors in all the rooms...   :-(

In our bedroom, the trim was painted with a black glossy enamel paint.  But not painted well-- just slapped on with one pass, with the brushstrokes showing on each piece.  And they got the black paint on the floor quite a bit when they did it.  Dummies.

Black paint from the trim

But it's all going to be good.  I'm so excited to see them all sanded, stained, and glowing.


Saturday, January 10, 2015

Starting On the Bedrooms & Main Bath


I had no idea when we'd start working on the rooms of the house, but it's suddenly happening!!  K and her bro did a bunch of work on the house today-- pulling off the painted, wrecked-up trim and starting to scrape off the popcorn ceiling in the nursery.
... Did I just say nursery?  That's right, I did!!  K and I are expecting a baby, due at the end of June.  We're over the moon about it.  And so, the spare bedroom is now being prepared to be the baby's room, just as we hoped it would be someday.

Popcorn ceiling on its way out

K had also spent a large part of her day in her office, so by the time the evening rolled around, she was itching to do some wrecking!  Getting rid of those things in the house that she's so sick of.
So... she took a jackhammer to the bathroom on the first floor.  She pulled off some of the tiles, and pulled down the storage above the bathtub. 

We have wanted to improve this bathroom since we bought the house.  I think that it may be original to the house...?  Or maybe it's a 70s remodel?  Not sure, but it's never been very functional for us.  The worst is how filthy it was.  After years of renters, we never could get it clean.  The bathtub, though iron, is a typical size, so a tall gal like me can't take a bath in it without my whole torso or all my legs sticking out of the water.  And with the storage above the shower, I'm too tall to take a shower in here!  The storage up there also wasn't necessary because there's a spacious cedar-lined closet in the bathroom already.

Our goals for remodeling this bathroom are to put in a deeper bathtub, make the shower usable for a tall lady like me, replace the worn-out vanity and maybe even put in two sinks.



I did make sure to keep those chrome pulls on the cabinets!




Again, I'm not sure if this bathroom is original or a remodel?  Once K started taking down some of the storage and tile, we could see that the walls under the storage used to be painted yellow.

Wednesday, October 10, 2012

Chandelier Rehab


K brought this chandelier home for me from a job.  The homeowner was getting all new lighting, and this was going to be trashed or donated.  K knew I would LOVE it, and she was right!  (I had one similar to this in my favorite apartment.)

Dusty, brassy goodness!

Beautiful details


But now I have a choice.  I can clean it up, make sure things are working properly...  but leave it the antiqued brass color.  OR, I could paint it.  I'm normally very against painting things, especially wood, to a color that they weren't originally.  But I've seen many pictures of painted chandeliers, and I'm just so drawn to the white ones!  This chandelier would be beautiful in white...  

I removed all the crystals, and soaked them in hot water and vinegar. Drained and dried them.  Now, they *sparkle*!!  Removed the plastic candle tubes, and taped over the candle and bulb areas.  Brought it outside, and painted it with a few coats of satin white spray paint, over the course of a few days.

Because a leafy, windy day is really the best time to spray paint something. 

white chandelier, painted chandelier, DIY chandelier, chandelier re-do



Amazing what a change it made!


Took a drive to Mohn Electric, in Uptown.  They helped me match the candle tubes, and grabbed me some new cardboard insulators.  Once home, I had to trim all the tubes down to 3 1/2 inches, because Mohn only had 4-inch tubes.  (I had seen some 3 1/2-inch ones online, but by the time I'd pay shipping, the price was ridiculous!)

Now all that remains is to put in the bulbs and install the light.  For now, this sparkly chandelier will just sit in the corner of the bedroom and wait.  But at least I got to check one small thing off my To Do List!

Wednesday, June 13, 2012

Our Kitchen Mural




Welcome to our kitchen!  Isn't it pretty?
We're pretty sure this kitchen scared away other potential buyers.  And of course, we're glad about it now!  But once we'd been in the house for a couple days, K said she couldn't stand it anymore -- it always feels like those 10 eyes are watching her...

Oh, and parts of it GLOW IN THE DARK!!  Parts of the eyes and teeth, and other various marks and spots are painted on in glow-in-the-dark paint.  No wonder K feels the eyes watching her.

Since I had the day off on a Tuesday, I decided to prime over it for her, so she wouldn't have to look at it anymore.

I took some time-lapse photos and turned them into a short video to document the covering-up of this masterpiece.
(For those of you with SLR experience, you might notice the video gets darker because I forgot to set my manual metering.  Oops.  Oh, well -- can't do it over!)