Thursday, April 30, 2015

Countertop Progress


Huge progress on the countertops on a gorgeous day.  K had gotten a great start on them in the past week or two, but got SO much done today.  Got the edging onto the island countertop, and got the sink and faucet installed into their piece.



The edging looks so great with the chrome cabinet pulls!  Can't wait to see these on the cupboard doors.


The countertops were light enough that I was able to help her carry the sink piece and the island piece into the kitchen before I ran off to work.  So I was able to see them in place and they looked fantastic!





Sunday, April 5, 2015

Kitchen Mudding


K's least favorite job is mudding.  But she needed to get it done so we could keep progressing on the kitchen.  Cutie worked on it all day and made tons of progress.  Visually, it made a huge difference to see all the seams gone, and have everything be one color.  Even though there's more to go, it just feels like things are coming along.






Friday, March 27, 2015

Living Room Shelves


K and I got a little sidetracked from our kitchen project...  We needed a little break, so we worked on something cool in our living room. 

I have had a couple Ikea Billy bookshelves forever, and was excited to get those into our living room and get my BOOKS onto the shelves, finally!   But K was reluctant, and couldn't figure right away why she didn't want the shelves and books in the living room.

She came up with the solution a couple days ago-- she would make built-in shelves for the living room.  What bothered her about my bookcases is how they just floated in the room and weren't connected to anything.  She didn't want shelves to be pieces of furniture in the room, she wanted shelves that were a part of the room.  She looked up mid-century shelves and was inspired by the wall units she saw.  Stuff like this:

Image via Google Images

She showed me a plan on Google Sketch-Up, to put shelves on the biggest wall in our living room, using galvanized pipe and wood shelves.  We played around with the measurements and placement of the shelves-- we both agreed it would be cooler if the shelves weren't exactly symmetrical.  And she fit the TV into the unit-- with the idea that we'd move her basement TV to the living room and she'd get a larger TV for the basement.

Planning, measuring, and counting the units of galvanized pipe and pipe fittings, then a couple trips to the Home Depot and we had everything we needed.

The first piece




























Babes putting up the 2nd column

We made some mistakes-- it's not the easiest project we've done, that's for sure.  But we figured it all out eventually.  And K found that some oak boards she'd been storing for about 4 years were going to be the perfect amount for making our shelves.  Which was great-- less to buy, and they'd already been salvaged from another project. 

The shelves still need to be stained, but we've made a lot of progress.  We love that we can still see the wall and the coves!




Trying out some stuff on the shelves

Wednesday, March 25, 2015

"New" Patio Door Install


Patio door install under way...



It's fine that K never got around to finishing off the inside of the walls around the door, since she'd just have to open it back up now.

Since this "new" door is a bit smaller than our older free door, we'll get a little bit of our walls back.  Not a huge deal, but it will give us a little more room to place the island.  

Tuesday, March 24, 2015

Local Shop Day - Metal Edging and Building Materials Outlet


Today, K and I set out to Loretto, MN, a ways past Maple Grove, to get the metal edging for our countertops.  I had only a vague idea of where we were, having never been out there before.  But we found Eagle Mouldings with no problems, and they were lovely and helpful people.  We found the edging we wanted very quickly.  They make Retro Aluminum edgings that you can use on countertops or tables or whatever.  They were inexpensive, and since we drove out there, we didn't have to pay for shipping.

http://eagle-aluminum.com/retro-nostalgic-50s/

Photo from Eagle Moulding's website -- Coincidence that we're using this same Formica and that we picked this same edging!

Since we were out, we decided to take another long trek to the Building Materials Outlet.  At some point last month, while working on our kitchen, one of K's guys had accidentally broken the inner pane of glass on our patio door.  Some little piece of something probably flew out of a tool and hit the glass, and caused the glass to completely shatter.  So, our free door was no longer as fabulous as it used to be.  The insulation factor was really gone for the rest of the winter.

Needing to replace that door wasn't a huge deal-- K had always wanted one that was a little smaller, and was planning to paint that door white because she hated the faux wood.  Having the door broken gave us a chance to replace it with something we liked more.

Building Materials Outlet had a TON of everything!  I know we'll go back to get windows-- they have thousands, for great prices.

K was torn between double French doors or another sliding door.  But we found a white sliding door from Pella, with the blinds inside the glass for $350.  Most of the French doors were double that.  We took the sliding door, and it should be great!  We'll reclaim about 6 inches of wall space, and have a lot more privacy when we want it.



Thursday, March 19, 2015

The Start of an Actual, Real-Life Living Room!


Since we bought this house, we have never had a living room for more than a day or two.  We started scraping the popcorn ceiling pretty quickly after we bought it, but then never finished.  I can think of a couple events -- a holiday party in 2012, and Thanksgiving in 2014 -- when we made it presentable enough.  But underneath the sisal rug, there was still Ram Board, and storage items were covered in drop clothes against one wall.  And it was always temporary.  For most of our almost 3 years here, the living room has been a storage space.

Today, that finally changed!  K was offered a free couch at her current work project, and we decided it was a great idea that she brought it home.  The room was close to being done-- ceiling and walls all done, floors too, of course.  Just the baseboards and trim needed to be added.  So we picked up the drop cloths on the floor, moved the tools and projects into the baby's room, vacuumed the floors.  K added the base boards to most of the room.

Baseboards in progress
The couch is a simple one from Ikea.  The cushion covers had been spilled on by the previous family's children, but I got them washed up and they look much better.  Ikea sells them separately, too, so we can replace them sometime soon.

Someday we'd like to get a nice couch from Room & Board, but for now, this one is perfect.  Durable, and the cushions are not new, so they've off-gassed already, and not so old that they're not falling apart.  The color is perfect, and we'll probably replace the legs with something more mid-century-looking.  K has already found some legs online that we can order.


New-to-us couch on our pretty, pretty floors!  <3

Wednesday, March 18, 2015

Formica Has Arrived


Our Formica order has arrived, and it's gorgeous!  Charcoal Boomerang pattern.  We'll be picking up some chrome edging soon, and then K will build our counters and top them off with this pretty pretty stuff.  I still can hardly believe that she agreed to use this pattern on our counters.